Previous  Next  Search
North Baja Pipeline, LLC
FERC Gas Tariff
Original Volume No. 1

Original Sheet No. 8A

                   STATEMENT OF EFFECTIVE RATES AND CHARGES

             NEGOTIATED RATE AGREEMENTS UNDER RATE SCHEDULE FTS-1

                  Explanatory Footnotes for Negotiated Rates
                           Under Rate Schedule FTS-1

5/  (Continued)

    (2)  This provision applies only to the portion of capacity held by 
         Shipper in excess of 90,000 Dth.
    (3)  The New Rate shall only apply for the duration of the term of 
         service provided to the Third Party Shipper, but in no event shall 
         apply beyond the term of this rate protection provision.
    (4)  This provision terminates December 31, 2017.  If the capacity held 
         by Shipper is permanently assigned or released to a similarly-
         situated replacement shipper, the rate protection provision shall be 
         extended to such replacement shipper.

6/  The transportation rate under this Agreement is a negotiated rate 
    consisting of a monthly reservation fee equal to $0.1019 times 30.4 days 
    for each month, plus a delivery rate of $0.0031 per Dth, plus ACA.  
    Shipper shall reimburse Transporter for fuel, line loss, and other 
    unaccounted for gas in kind at a rate of 0.7%.  This rate shall be fixed 
    for the term of this Agreement.

    Rate Protection Provision:
    (1)  This provision applies only to gas that is delivered to NBP at 
         Ehrenberg, AZ.  To the extent NBP and Gasoducto Bajanorte ("GB") 
         separately provide long-term (greater than 364 days) firm 
         transportation service to a Third Party Shipper in the Western Zone 
         at a combined rate that is lower than $0.270 per Dth on a 100% load 
         factor basis (excluding non-pipeline surcharges), or in the Mexicali 
         Zone at a combined rate that is lower than $0.245 per Dth, then the 
         rate applicable to Shipper for service on NBP shall be reduced in 
         accordance with the following formula:

         NR = OR - ((CTR - TPR) x 0.4286)

         Where: NR = New Rate level at which Shipper will receive service on 
                      NBP.  Resulting unit rate will be converted to a 
                      reservation/delivery structure where the delivery rate 
                      will equal three (3) percent of the NR;
                OR = Shipper's negotiated Original Rate on NBP or $0.105 per 
                      Dth on a 100% load factor basis;
                CTR = Competitive Threshold Rate which is $0.270 per Dth for 
                      the Western Zone and $0.245 per Dth for the Mexicali 
                      Zone; and
                TPR = Third Party Rate for the combined NBP and GP path.
                                                                  (Continued)

Issued by: John A Roscher, Director of Rates & Regulatory Affairs
Issued on: July 26, 2005                      Effective on: July 27, 2005
Previous  Next  Search