North Baja Pipeline, LLC
FERC Gas Tariff
Original Volume No. 1

Original Sheet No. 109

                   GENERAL TERMS AND CONDITIONS OF SERVICE
                                 (Continued)

3.  MEASURING EQUIPMENT

    3.1   Installation:  Unless NBP and Shippers agree otherwise, all gas 
          volume measuring equipment, devices and materials at the point(s) 
          of receipt and/or delivery shall be furnished and installed by NBP 
          at Shipper's expense including the tax-on-tax effect, net of the 
          present value of any prospective tax depreciation benefits.  All 
          such equipment, devices and materials shall be owned, maintained 
          and operated by NBP.  Shipper may install and operate check-
          measuring equipment provided it does not interfere with the use of 
          NBP's equipment.

    3.2   Testing Meter Equipment:  The accuracy of either NBP's or 
          Shipper's measuring equipment shall be verified by test, using 
          means and methods acceptable to the other party, at intervals 
          mutually agreed upon, and at other times upon request.  Notice of 
          the time and nature of each test shall be given by the entity 
          conducting the test to the other entity sufficiently in advance to 
          permit convenient arrangement for the presence of the 
          representative of the other entity.  If, after notice, the other 
          entity fails to have a representative present, the results of the 
          test shall nevertheless be considered accurate until the next 
          test.  If any of the measuring equipment is found to be 
          registering inaccurately in any percentage, it shall be adjusted 
          at once to read as accurately as possible.  All tests of such 
          measuring equipment shall be made at the expense of the entity 
          conducting the same, except that the other entity shall bear the 
          expense of tests made at its request if the inaccuracy is found to 
          be two percent (2%) or less.

     3.3   Correction and Adjustment:  If at any time any of the measuring 
           equipment is registering inaccurately by an amount exceeding two 
           percent (2%) at a reading corresponding to the average hourly rate 
           of flow, the previous readings of such equipment shall be 
           corrected to zero error for any period definitely known or agreed 
           upon, or if not so known or agreed upon, the lesser of one-half 
           (1/2) of the elapsed time since the last test or six (6) months 
           from the production month with a three-month rebuttal period, 
           provided, however, that this limitation shall not apply in the 
           case of a deliberate omission or misrepresentation or mutual 
           mistake of fact.  The parties' other statutory or contractual 
           rights shall not otherwise be diminished by this limitation.  If 
           the measuring equipment is out-of-service, the volume of gas 
           delivered during such period shall be determined:


                                                                  (Continued)

Issued by: John A Roscher, Director of Rates & Regulatory Affairs
Issued on: June 6, 2002                       Effective on: August 12, 2002
Filed to comply with order of the Federal Energy Regulatory Commission, Docket 
No. CP01-22-000, et al., issued May 18, 2001, 95 FERC ¶ 61,259