GENERAL TERMS AND CONDITIONS OF SERVICE
(Continued)
14. SCHEDULING AND NOMINATIONS (Continued)
14.2 Nomination Cycles (Continued)
(d) THE INTRADAY 2 NOMINATION CYCLE:
5:00 p.m. (CCT) (3:00 p.m. PCT) nominations leave control of
the nominating party;
5:15 p.m. (CCT) (3:15 p.m. PCT) receipt of nominations by
NBP;
5:30 p.m. (CCT) (3:30 p.m. PCT) NBP sends Quick Response;
8:00 p.m. (CCT) (6:00 p.m. PCT) receipt of completed
confirmations by NBP from upstream and downstream connected
parties;
9:00 p.m. (CCT) (7:00 p.m. PCT) NBP provides scheduled
quantities to affected Shippers and point operators.
Scheduled quantities resulting from Intraday 2 Nominations
should be effective at 9:00 p.m. (CCT) (7:00 p.m. PCT) on
gas day.
Firm intraday nominations during the Intraday 2 Nomination
Cycle may not bump nominated and scheduled interruptible
volumes.
(e) For purposes of NAESB Standards 1.3.2 ii, iii, and iv
(reflected in Paragraphs 14.2(b) through 14.2(d) above),
"provide" shall mean, for transmittals pursuant to NAESB
Standards 1.4.x, receipt at the designated site, and for
purposes of other forms of transmittal, send or post.
Transporter shall, at the end of each business day, make
available to each Shipper information containing scheduled
quantities including scheduled intraday nominations and any
other scheduling changes.
(Continued)
|
Issued by: John A Roscher, Director of Rates & Regulatory Affairs
Issued on: June 6, 2002 Effective on: August 12, 2002
Filed to comply with order of the Federal Energy Regulatory Commission, Docket
No. CP01-22-000, et al., issued May 18, 2001, 95 FERC ¶ 61,259 |