GENERAL TERMS AND CONDITIONS OF SERVICE
(Continued)
14. SCHEDULING AND NOMINATIONS (Continued)
14.2 Nomination Cycles (Continued)
(e) (Continued)
NBP shall have the discretion to accept nominations at such
later times as operating conditions permit and without
detrimental impact to other Shippers and upon confirmation
that corresponding upstream and downstream arrangements in a
manner satisfactory to NBP have been made. In the event
later nominations are accepted, NBP will schedule those
nominations after the nominations received before the
nominations deadline, which is in accordance with NAESB
Standard 1.3.6, Version 1.8, that states nominations
received after nomination deadline should be scheduled after
the nominations received before the nomination deadline.
14.3 Changes to Nominations
(a) Changes to Standing Nominations
In accordance with NAESB Standard 1.3.7, Version 1.8, all
nominations should be considered original nominations and
should be replaced to be changed. When a nomination for a
date range is received, each day within that range is
considered an original nomination. When a subsequent
nomination is received for one or more days within that
range, the previous nomination is superseded by the
subsequent nomination only to the extent of the days
specified. The days of the previous nomination outside the
range of the subsequent nomination are unaffected.
Nominations have a prospective effect only.
Such nominations must be received by NBP's Transportation
Department in accordance with the scheduling timelines set
out in Paragraph 14.2.
In the event NBP does not receive information of upstream or
downstream adjustments, NBP shall use the lesser of the new
nomination or the previous nomination.
(Continued)
|
Issued by: John A Roscher, Director of Rates & Regulatory Affairs
Issued on: June 1, 2009 Effective on: August 1, 2009
Filed to comply with order of the Federal Energy Regulatory Commission, Docket
No. RM96-1-029, issued February 14, 2009 |