Previous  Next  Search
North Baja Pipeline, LLC
FERC Gas Tariff
Original Volume No. 1

Third Revised Sheet No. 145
Superseding
Second Revised Sheet No. 145

                   GENERAL TERMS AND CONDITIONS OF SERVICE
                                 (Continued)

14. SCHEDULING AND NOMINATIONS (Continued)

    14.2  Nomination Cycles (Continued)

           (e)  (Continued)

                 NBP shall have the discretion to accept nominations at such 
                 later times as operating conditions permit and without 
                 detrimental impact to other Shippers and upon confirmation 
                 that corresponding upstream and downstream arrangements in a 
                 manner satisfactory to NBP have been made.  In the event 
                 later nominations are accepted, NBP will schedule those 
                 nominations after the nominations received before the 
                 nominations deadline, which is in accordance with NAESB 
                 Standard 1.3.6, Version 1.8, that states nominations 
                 received after nomination deadline should be scheduled after 
                 the nominations received before the nomination deadline.

    14.3  Changes to Nominations

          (a)   Changes to Standing Nominations

                In accordance with NAESB Standard 1.3.7, Version 1.8, all 
                nominations should be considered original nominations and 
                should be replaced to be changed.  When a nomination for a 
                date range is received, each day within that range is 
                considered an original nomination.  When a subsequent 
                nomination is received for one or more days within that 
                range, the previous nomination is superseded by the 
                subsequent nomination only to the extent of the days 
                specified.  The days of the previous nomination outside the 
                range of the subsequent nomination are unaffected.  
                Nominations have a prospective effect only.   

                Such nominations must be received by NBP's Transportation 
                Department in accordance with the scheduling timelines set 
                out in Paragraph 14.2.

                In the event NBP does not receive information of upstream or 
                downstream adjustments, NBP shall use the lesser of the new 
                nomination or the previous nomination.


                                                                  (Continued)

Issued by: John A Roscher, Director of Rates & Regulatory Affairs
Issued on: June 1, 2009                       Effective on: August 1, 2009
Filed to comply with order of the Federal Energy Regulatory Commission, Docket 
No. RM96-1-029, issued February 14, 2009
Previous  Next  Search