GENERAL TERMS AND CONDITIONS OF SERVICE
(Continued)
16. BALANCING (Continued)
16.1 (Continued)
(c) Actual confirmed receipt quantity exceeds actual delivered
quantity
A net positive imbalance shall exist if the difference
between the quantity received (nominated, scheduled, and
confirmed) and the quantity delivered, taking into account
the reduction in quantity for compressor fuel use, yields a
positive result. Commencing upon notification by NBP of the
existence of the imbalance, and to the extent that the NBP
system is not constrained or its integrity is not threatened
and NBP has not issued an Operational Flow Order, Shipper
shall have three (3) days to correct the imbalance.
(Continued)
|
Issued by: John A Roscher, Director of Rates & Regulatory Affairs
Issued on: January 23, 2004 Effective on: August 12, 2002
Filed to comply with order of the Federal Energy Regulatory Commission, Docket
No. RP02-363, et al., issued December 24, 2003 |